|
The Town of Greece Technical Services Department supplies a specific list of required inspections to the applicant, along with the building permit. Generally the Town inspects construction at the following stages:
Footings before pouring Foundations before backfill Framing, plumbing, and heating before the installation of insulation Insulation before finish materials are applied Final before use or occupancy
A representative of the applicant should be on site at the time of inspection to receive the inspection report from the inspector. A copy of the inspection report will be mailed to the applicant if the inspector is unable to leave it with someone at the time of inspection. (FAQ10703)
|